A project undertaken in the heart of the Cairngorm National Park with works under close scrutiny from the Cairngorm National Park Authority. Work comprised of bulk earthworks and infrastructure including roads, drainage, and utilities for a 53 plot housing development

Location:  Grantown on Spey
Type of works: Civils Enabling Works
Contract Value: £696,000

Download this Case Study (PDF)

Project Notes:

  • Suitable mitigation methods adopted to protect otter habitats, and prevent pollution to on site watercourse during works
  • Tree protection areas
  • 30,000m3 of bulk earthworks
  • 800m of site drainage installed
  • 400m of new roadway
  • Installation of a 20 metre long box culvert to carry the permanent road over the burn
  • 1,000m of utility services installed